Simulation 01 — Rollout Timeline
When would your
rollout finish?
Aria's standard wireless drawing cadence is 25–50 sites per week, scaling to 300–500 sites over one to two months with advance notice. This tool models how long a program of your size takes at that cadence. It is a planning estimate, not a contractual schedule.
Program parameters
—total program duration
—estimated completion
—average sites per week
—first sealed drawings land
◆ Preliminary planning estimate from published cadence (25–50 sites/week standard, 300–500 over one to two months at scale, pipeline stages: site visit 1–3d → structural 3–5d → CDs 5–10d → PM handoff 1d). Permitting and jurisdiction variance not included — see the Permitting Time Map. Final schedule confirmed at kickoff.
In short
- Aria's standard production cadence is 25–50 sites per week.
- With advance notice Aria opens parallel drawing lanes and scales to 300–500 sites over one to two months.
- Program work runs in parallel lanes, so weekly throughput holds when individual sites are delayed.
- This tool produces a planning estimate. Committed schedules are issued after scope review.