Simulation 08 — Capacity Calendar

If you sign today,
when do we start?

Aria runs two intake lanes for wireless programs: a standard lane at 25–50 sites per week and a surge lane reaching 300–500 sites over one to two months. Program starts require four weeks' notice. The board below shows available intake windows for the next eight weeks.

—
current pipeline load
Week ofStandard lane · 25–50/wkSurge lane · 300–500 / 1–2 mo
Slots open Nearly full Full Needs 4-wk notice

◆ Intake slots refresh weekly as programs close out. Illustrative availability for planning only. Confirm current availability with your project manager before committing a start date. Reserving a window is free and non-binding until the MSA is signed.

Your reservation

Pick a weekClick a row on the calendar

A reservation opens the onboarding packet (MSA, COI, vendor forms) so the week you picked starts with drawings, not paperwork.

In short

  • Aria's standard intake lane runs at 25–50 sites per week.
  • Aria's surge lane scales to 300–500 sites over one to two months and requires advance notice.
  • Program starts require four weeks' notice to open drawing lanes and assign a project manager.
  • Availability shown on this board is indicative; a window is confirmed only after scope review.